Anglais
During the period of June 21 to July 4, 2010, I carried out my professional training course within fast Electro Company located in Island of Mayotte in the town of Sada. I chose d' to carry out my period of training course on their premises, because activities of l' company correspond to the formation, (electricity building, security system, air-conditioning, setting to the standards.). During this training course I was brought to carry out different activity of which the pulling of cable, of electrical installation and some breakdown service.
During these two weeks of training courses I could take part in an installation in two houses SIM (Real estate Company of Mayotte) standard T3 during three days with the assistance of my tutor and the personnel. I passed from the cables in sheaths to then be able to connected the catches, the contacts, the ventilators. I took part in the installation of taken the sectors, the industrial ventilators and the lights. One intervened on certain houses located on different villages. One carried out some breakdown services of which this one where were brought has intervention at a private individual because at the time of a connection in a catch there was cut of the installation, one had to check the continuity of the cables in the catch then one removed them and there one s' is seen that they were damaged and wet. Thus one replaced the cables and connected the catch. This training course allowed me to carry out the difference between the work carried out in company and the work carried out within the framework in my formation. It brought me much professional and social knowledge, I learned that my trade was based first of all on safety, the respect of the standards. My main objective was to integrate me and work in total autonomy on the building sites, or in intervention. the development of this training course has as an independent source of the various lesson